We will configure the appropriate equipment/production line based on the specifications of you products. After you company gets in touch with us, we will provide you with accurate infomation and quotations.
The Automatic Loading Tube End Forming Machine is developed for manufacturers seeking efficient, continuous, and reliable tube end processing. By integrating an automatic loading system with the tube end forming machine, the equipment enables uninterrupted production while reducing manual handling and improving workplace safety.
The automated loading mechanism accurately feeds tubes into the forming station, ensuring stable positioning and consistent forming quality. This solution is ideal for medium- to high-volume production environments that require increased productivity, lower labor costs, and improved manufacturing efficiency.
The machine can be configured with hydraulic or servo-driven forming systems and customized tooling to meet different tube specifications and production requirements.
| Item | TM30 | TM40 | TM60 | TM80 | |
|---|---|---|---|---|---|
| Max pipe diameter | Iron pipe | 30mm*2mm | 40mm*2mm | 60mm*2mm | 80mm*2mm |
| Stainless pipe | 30mm*1.2mm | 40mm*1.2mm | 60mm*1.2mm | 80mm*1.5mm | |
| Max forming length | 80mm | 100mm | 120mm | 150mm | |
| Max clamping length | 50mm | 60mm | 80mm | 100mm | |
| Max forming pressure | 4.5T | 5.5T | 7T | 14T | |
| Max clamping pressure | 4T | 5T | 6T | 12.5T | |
| Max working pressure | 12Mpa | 12Mpa | 12Mpa | 12Mpa | |
| Oil volume | 80L | 100L | 100L | 150L | |
| Opearting height | 950mm | 980mm | 980mm | 1100mm | |
| Size | 1500*1340*1600mm | 2100*1000*1450mm | 2300*1000*1495mm | 2680*1100*1590mm | |
| Weight | 1800kg | 1200kg | 1400kg | 1800kg |
We will configure the appropriate equipment/production line based on the specifications of you products. After you company gets in touch with us, we will provide you with accurate infomation and quotations.
1 set.
The fully automated production line takes 90 working days.
For fully automated single machines with a quantity of ≥5, it takes 60 working days.
We provide instructions. After the transaction is completed, we will provide the corresponding customs clearance documents: CI, PL, BL, CO (the certificate of origin, if the customer requires it)
We are very close to the airports in Shanghai, Wuxi, and Nantong.If you plan to visit our factory, you can contact us and we will arrange for someone to pick you up at the airport.
1 year.
We accept T/T.