We will configure the appropriate equipment/production line based on the specifications of you products. After you company gets in touch with us, we will provide you with accurate infomation and quotations.
The Dual Tube End Forming Machine is developed for manufacturers seeking higher production output without compromising forming quality. Unlike conventional tube end forming machines that process one tube at a time, this machine is equipped with a dual-workpiece forming system that enables two tubes to be processed simultaneously within a single production cycle.
This design effectively doubles production capacity while maintaining consistent dimensional accuracy and repeatability. It is especially suitable for mass production of identical tube components used in automotive, HVAC, heat exchanger, furniture, and industrial applications.
The machine can be configured with hydraulic or servo-driven systems and customized tooling to accommodate different tube diameters, materials, and forming requirements.
| Item | TM30 | TM40 | TM60 | TM80 | |
|---|---|---|---|---|---|
| Max pipe diameter | Iron pipe | 30mm*2mm | 40mm*2mm | 60mm*2mm | 80mm*2mm |
| Stainless pipe | 30mm*1.2mm | 40mm*1.2mm | 60mm*1.2mm | 80mm*1.5mm | |
| Max forming length | 80mm | 100mm | 120mm | 150mm | |
| Max clamping length | 50mm | 60mm | 80mm | 100mm | |
| Max forming pressure | 4.5T | 5.5T | 7T | 14T | |
| Max clamping pressure | 4T | 5T | 6T | 12.5T | |
| Max working pressure | 12Mpa | 12Mpa | 12Mpa | 12Mpa | |
| Oil volume | 80L | 100L | 100L | 150L | |
| Opearting height | 950mm | 980mm | 980mm | 1100mm | |
| Size | 1500*1340*1600mm | 2100*1000*1450mm | 2300*1000*1495mm | 2680*1100*1590mm | |
| Weight | 1800kg | 1200kg | 1400kg | 1800kg |
We will configure the appropriate equipment/production line based on the specifications of you products. After you company gets in touch with us, we will provide you with accurate infomation and quotations.
1 set.
The fully automated production line takes 90 working days.
For fully automated single machines with a quantity of ≥5, it takes 60 working days.
We provide instructions. After the transaction is completed, we will provide the corresponding customs clearance documents: CI, PL, BL, CO (the certificate of origin, if the customer requires it)
We are very close to the airports in Shanghai, Wuxi, and Nantong.If you plan to visit our factory, you can contact us and we will arrange for someone to pick you up at the airport.
1 year.
We accept T/T.
