We will configure the appropriate equipment/production line based on the specifications of you products. After you company gets in touch with us, we will provide you with accurate infomation and quotations.
The Double Head Multi-Station Tube End Forming Machine is an advanced tube processing solution developed for manufacturers requiring high production capacity, precision forming, and flexible processing capabilities.
Compared with single-head or single-station machines, the double-head multi-station configuration allows multiple forming operations to be completed within one production cycle. The dual forming heads improve efficiency, while the multi-station design enables different forming steps such as expanding, reducing, flaring, and shaping to be performed sequentially.
With a rigid machine structure, precise positioning system, and customizable tooling design, this machine delivers stable forming quality and consistent production performance for various metal tube applications.
| Item | TM30 | TM40 | TM60 | TM80 | |
|---|---|---|---|---|---|
| Max pipe diameter | Iron pipe | 30mm*2mm | 40mm*2mm | 60mm*2mm | 80mm*2mm |
| Stainless pipe | 30mm*1.2mm | 40mm*1.2mm | 60mm*1.2mm | 80mm*1.5mm | |
| Max forming length | 80mm | 100mm | 120mm | 150mm | |
| Max clamping length | 50mm | 60mm | 80mm | 100mm | |
| Max forming pressure | 4.5T | 5.5T | 7T | 14T | |
| Max clamping pressure | 4T | 5T | 6T | 12.5T | |
| Max working pressure | 12Mpa | 12Mpa | 12Mpa | 12Mpa | |
| Oil volume | 80L | 100L | 100L | 150L | |
| Opearting height | 950mm | 980mm | 980mm | 1100mm | |
| Size | 1500*1340*1600mm | 2100*1000*1450mm | 2300*1000*1495mm | 2680*1100*1590mm | |
| Weight | 1800kg | 1200kg | 1400kg | 1800kg |
We will configure the appropriate equipment/production line based on the specifications of you products. After you company gets in touch with us, we will provide you with accurate infomation and quotations.
1 set.
The fully automated production line takes 90 working days.
For fully automated single machines with a quantity of ≥5, it takes 60 working days.
We provide instructions. After the transaction is completed, we will provide the corresponding customs clearance documents: CI, PL, BL, CO (the certificate of origin, if the customer requires it)
We are very close to the airports in Shanghai, Wuxi, and Nantong.If you plan to visit our factory, you can contact us and we will arrange for someone to pick you up at the airport.
1 year.
We accept T/T.